Page 46 - Risorse_Energetiche_Favignana_2005
P. 46

Proposal APERTURES.  PART      B        Priority6.1.3.1.1.2    -  FP6-2005-TREN-4                                                  p 39 of 49

          6.4 Detailed work description

          6.4.1 Workpackage list

            Work-               Workpackage title             Lead       Person-     Start     End      Deliv-
            package                                         contractor   months     month     month     erable
              No                                               No                                         No

                      Site Specifications & Benchmarking
              1                                               3 ISSI       41         0         11      D1.xx
                      /Islanded Power Needs Analysis &
                      Characterisation
                      Innovative Choice, Design,
              2
                      Implementation and Optimal Control of   2 UTBM
                      RES Generation Units and Interface to               149         0         35      D2.xx
                      the Local Distribution Grid in Embedded
                      Generation
                      Research In Innovative Applicable Grid
              3                                              4 NOTT       121         0         35      D3.xx
                      Control Models & Strategy Optimisation/
                      Development Of The Control  Strategy

              4       Research & Development Of An           1 CIRT        80         0         35      D4.xx
                      Innovative Multi-Source Energy
                      Converter (Msc)


              5       Real-Scale  Plug-Play Green Grid System   SEA        50         23        35      D5.xx
                      Implantation & Tests  FAVIGNANA

              5B      Real-Scale  Plug-Play Green Grid System   TCPE       36         23        35      D5B.xx
                      Implantation & Tests  MARIBOR
                      Dissemination Of Results &
              6                                              5 MARI        25         11        35      D6.xx
                      Technology  Upscale Perspectives
              7       Project Promotion, Management &        1 CIRT        18         0         35      D7.xx
                      Sustainable Exploitation Plan

                      TOTAL                                               520



          6.4.2 Deliverables list

          Deliver                                                                       Delivery        Dissemi
                                                                                                  Nat
           able                              Deliverable title                            date    ure    nation
            No                                                                          (Month)           level
          D1.1     Analysis and description of renewable sources available in the Favignana site: assessment of
                   wind map of the island (speed and direction of the wind), assessment of the solar radiation in   12   R   CO+P
                   the island. The analysis will be performed monthly during the year under observation.
          D1.2     Identification of the ideal location for photovoltaic modules and wind towers and related   12   R   CO+P
                   installed power on the basis of the analyses of D1.1 deliverables;
          D1.3     Project of the real location for photovoltaic modules and wind tower and related installed   12   R   CO+P
                   power on the bases of the constraints due to the landscape environment and local laws;
          D1.4     Electrical model of the grid (topology, impedance and installed protections) and current   12   R   CO+PP
                   traditional generation system;
          D1.5     Definition of the load diagram during the year of observation; definition of the relative   12   R   CO+PP
                   cycles summer-winter;
          D1.6     Toolbox for the numerical dynamical simulation of the electrical grid of Favignana, its
                                                                                           12     O     CO+PP
                   traditional generation system and the existing protection system;
          D1.7     Toolbox for correlating the choice of the RES plant’s location with the resource availability;   12   O   CO+PP
          D1.8     Design criteria of the RES components in order to choose low impact project’s solutions.   12   R   CO+PP
          D1.9     Definition of microgrids in Favignana and the PCC points with DG generetators;    12   R   CO+PP
          D2.1.    Development of a toolbox for the simulation of RES generators and their control.   17   O   CO+PP
          D2.2     Development of a toolbox for the simulation of on line maximum power point
                                                                                           23     O     CO+PP
                   tracking (MPPT) in photovoltaic and wind generation systems and Fuel cells.
          D2.3     Development of a toolbox for the simulation control algorithm which guarantees minimum   23   O   CO+PP
                   cost operation of each generation unit and of the overall co-ordinated multi RES system.
   41   42   43   44   45   46   47   48   49   50   51