Proposal APERTURES.  PART      B        Priority6.1.3.1.1.2    -  FP6-2005-TREN-4                                                  p 40 of 49
          Deliver                                                                       Delivery        Dissemi
                                                                                                  Nat
           able                              Deliverable title                            date    ure    nation
            No                                                                          (Month)           level
          D2.4     Experimental implementation on hardware of the techniques in D2.1, D2.2, D2.3.   23   R   CO
          D 2.5    Characterisation and design of the Fuel Cell System and its converter   23     R     CO+PP
          D 2.6    Characterisation and design of the Photovoltaic array System and its converter   23   R   CO+PP
          D 2.7    Characterisation and design of the Super-capacitors and its converter   23     R     CO+PP
          D 2.8    Characterisation and design of the electrolyser and reformer,  the storage system  and the   23   R   CO+PP
                   supply system for H2 and O2
          D2.9     Characterisation and design of the wind generation system and its converter   23   R   CO+PP
          D3.1     Use of impedance measurement in power quality equipment, to enhance operation and   23   R   CO
                   reliability
          D3.2     Techniques for local voltage control – both magnitude and quality – from embedded   23   R   CO
                   generation with power electronic interface
          D3.3     New on-line methodologies to discriminate between fault scenarios and determine suitable
                                                                                           23     O     CO+PP
                   corrective action
          D3.4     New methodologies for the control of islanded systems                  23+34   O     CO
          D 3.5    Design of optimum power electronic equipment for RES and energy storage   23   R     CO
          D 3.6    Auto-tuning  for power electronic interfaces                           23+34   R+P   CO
          D 3.7    Plug-and-play operation of power electronic interfaces                 23+34   P     CO
          D4.1     Analysis on different types of conversion topologies, filtering technologies and commands to   12+24   R   CO+PP
                   make the best compromise between power efficiency and quality.
          D4.2      Design of different power converter prototypes, taking into account results of the analysis   12+24   R   CO
                   and future hardware needs for the implementation of the control strategies.
          D4.3      Fabrication and tuning of the power converter prototypes.           24        P     CO
          D4.4      Implementation of the control strategies (software) for the plug and play ability.   24+34   O   CO
          D4.5      Installation on site tuning and testing of the different strategies. Validation.   24+34   R+P   CO
          D4.6     Interface with the toolbox. Configuration of the system controlled by the toolbox.    24+34   O   CO
          D5.1     Testing of the MSC connected to the electrical grid of Favignana        29     R     RE +P
          D5.2     Testing of the supervisory control system of the whole grid and its telecontrol system   33   R   RE +P
          D5.3     Testing of the whole electrical grid of Favignana with MSCs and supervisory control in   35   R   RE +P
                   normal working conditions
          D5.4     Testing of the whole electrical grid of Favignana with MSCs and supervisory control in   35   R   RE +P
                   critical working conditions
          D5.5     Evaluation of the save of gasoline not emplyed by diesel generators thanks to the RES in   35   R   CO+P
                   Favignana
          D5B.1    Testing of the MSC connected to the electrical grid of Maribor          29     R     CO+P
          D5B.2    Testing of the supervisory control system of the grid and its telecontrol system   33   R   CO+P
          D5B.3    Testing  of  the  electrical  grid  of  Maribor  with  MSCs  and  supervisory  control  in   35   R   CO+P
                   normal working conditions
          D5B.4    Testing  of  the  electrical  grid  of  Maribor  with  MSCs  and  supervisory  control  in
                                                                                           35     R     CO+P
                   critical working conditions
          D5B.5     Evaluation of the reduction of CO 2  emissions thanks to the RES in Maribor   35   R   P
          D5.6     Evaluation of the reduction of CO2 emissions thanks to the RES in Favignana   35   R   P
          D6.1     EPE-PEMC 2006 Conference in Portoroz, Slovenia • August 30 - September 1, 2006   0   O   P
          D6.2     Data-base of possibly interested SME’s •                                33     O     P
          D6.3     Report of the Closing Meeting •                                         36     R     CO
          D6.4     Technology upscale report                                               35     R     P
          D6.5     Web page completion                                                     36     O     P
          D7.1     Project Website for the public at large , surveys                       0      O     P
          D7.2     Website for on-line management + project management platform            0      O     P
          D7.3     Market Assessment report and Exploitation plans                        18+35   R     PP+CO
          D7.4     Regular progress reports and financial reports, as stated in the contract        R   CO
          D7.5     Project assessment report at completion                                 35     R     CO+P
          6.4.3 Description of each workpackage

          .
   42   43   44   45   46   47   48   49   50   51   52