Page 48 - Risorse_Energetiche_Favignana_2005
P. 48

Proposal APERTURES.  PART      B        Priority6.1.3.1.1.2    -  FP6-2005-TREN-4                                                  p 41 of 49
           Workpackage number   1         Start /close date / starting event:              0    to 11          (12 months)
           Workpackage Title     Site Specifications & Benchmarking /Islanded Power Needs Analysis &
                                 Characterisation
           Participant identity   ISSI      SEA     CIRT    SASS                                   TOTAL
           Person-months         35       2         1       3                                      41
           Objectives:  the characterization of the site of Favignana from both the energetic and electrical point of view.
           Energetic point of view: (this WP will  be done in Maribor too, but as it has been done before, it will be reassessed )
           ·  identification of the overall renewable resources (solar and wind) available in Favignana.
           ·  creation of a wind and a solar map of the island.
           ·  analysis of new technologies to interface single and multiple renewable energy sources and to trace an “eco-profile” of such
            technologies. + tracing of  “eco-profile” RES technologies
           Electrical point of view:
           ·  characterization of the electrical grid of the island of Favignana.
           ·  measurement of the load diagram of the island, on a monthly basis, during a one year period.
           ·  definition of the quantity of the ideal overall generation power from renewable sources and its ideal location for the best
            exploitation of the sources themselves, taking into consideration the stockage systems (Fuel cells and supercapacitors)
           ·  choice of the actual solar and wind generation power units on the basis of the constraints of the local authorities due to the
            landscape and environmental impact
           ·  Identification of significant environmental indicators in order to monitor and estimate the environmental performances of
            the proposed solutions.
           Description of work :  Mains tasks
           Approach:  This work will be organized in two parallel ways with the aid of two subcontractors:
           Task 1.1: (M1 to M 9) Identification of the overall renewable resources (solar and wind) available in Favignana, for their
           consequent employment for electric energy production. An analysis of the wind speed and direction as well as the intensity of
           the solar radiation will be done all over the island of Favignana so to create respectively a wind and a solar map of the island.
           This task will be done by the subcontractor DREAM.
           Task 1.2 :  (M1 to M 9) Electrical model: At the same time, the electrical model of the network of Favignana will be defined
           exactly: from the generation system (currenly only Diesel based) to the Medium/Low voltage transformers and finally to the
           peripheral load. Then, the load diagram of the island will be measured on a monthly basis, during a one year period, to know
           exactly the electrical energy consumption of the entire island both in Summer and Winter. This task will be done by the
           subcontractor DIEET.
           Task 1.3 : (M9 to M 12) On the basis of the retrieved load diagram, of the topology and characterization of the electrical
           network as well as  the wind and solar maps, the quantity of the ideal overall generation power from renewable sources will
           be devised as well as its ideal location for the best exploitation of the sources themselves. Afterwards, the real amount of
           power from renewable sources to be installed and their real location will be defined, on the basis of the availability of the
           territory as well as the constraints of the local authorities due to the landscape and environmental impact.   the same time, the
           “eco-profile” of RES technologies will be traced, and therefore the environmental performances of the proposed solutions will
           be evaluated.This task will be done together by ISSIA, DIEET and DREAM.
           Task 1.4 : (M10 to M 12) On the basis of the obtained results, the various parts of electrical grid which behave like
           microgrids will be identified and consequently the different points of common coupling (PCC) between the DG generators
           and the existing electrical grid through multi-source converters will be assessed together with the corresponding power
           supplied locally by DG generators.
           Deliverables
           ·  D1.1 Analysis and description of renewable sources available in the Favignana site: assessment of wind map of the island (speed and
            direction of the wind), assessment of the solar radiation in the island. The analysis will be performed monthly during the year under
            observation.
           ·  D1.7 Toolbox for correlating the choice of the RES plant’s location with the resource availability;
           ·  D1.8 Design criteria of the RES components in order D1.2 Identification of the ideal location for photovoltaic modules and wind towers
            and related installed power on the basis of the analyses of D1.1 deliverables;
           ·  D1.3 Project of the real location for photovoltaic modules and wind tower and related installed power on the bases of the constraints due
            to the landscape environment and local laws;
           ·  D1.4 Electrical model of the grid (topology, impedance and installed protections) and current traditional generation system;
           ·  D1.5 Definition of the load diagram during the year of observation; definition of the relative cycles summer-winter;
           ·  D1.6 Toolbox for the numerical dynamical simulation of the electrical grid of Favignana, its traditional generation system and the
            existing protection system;
           ·  to choose low impact project’s solutions.
           · D1.9 Definition of microgrids in Favignana and the PCC points with DG generators;
           Milestones and expected result
           ·  M 1.6    Meeting with subcontractor DREAM to discuss about assessment of wind map (speed and direction of the wind) of the island, assessment of the
            solar radiation in the island
           ·  M 1.12 Meeting with subcontractor DIEET to discuss about the electrical model of the grid (topology, impedance and installed protections) and current
            traditional generation system & about ideal and real allocation of different types of renewable sources and corresponding installed power.
           ·  R 1.1 : Electrical model of the grid + Renewable energetic model of Favignana island
           ·  R1.2 :choice of the different points of common coupling (PCC) between the DG generators & existing electrical grid.
           · R1.3: choice of the power supplied locally by DG genererators.